Todos · selections · budget
The tracker
Furniture, selections, budget, timeline — one place. Progress saves in this browser.
House todos
0/29
Room todos
0/64
Selections decided
0/154
Punch list
0/11
- Paint all walls (whole house)
- Repair kitchen cabinets
- Purchase and install TVs
- Install WiFi — map Ethernet locations first
- Buy and install Google cameras
- Install ADT/Google security system
- Buy and install neon sign: “tengo mis suenos contigo”
- Update master closet
- Relocate master-closet sauna to basement
- Jess: convert former guest bedroom to walk-in closet (closet to be built)
- Audio system — install amps and other speakers
Closing & admin
0/4
- Collect keys, codes, garage remotes, elevator key
- Transfer utilities (Con Ed, water, internet)
- Homeowner's insurance + alarm monitoring active
- Change locks / rekey exterior doors
Systems
0/6
- HVAC service — all 3 zones
- 48kW generator service + test
- Elevator inspection + service contract
- Radiant floor + boiler check
- Heated driveway / roof test before winter
- Collect manuals + vendor contacts into one binder
Design
0/4
- Whole-house paint palette
- Lighting fixture refresh plan
- Window treatment measurements
- Furniture plan per floor
Move-in
0/4
- Book movers + confirm date
- Deep clean before move-in
- Wi-Fi / network + AV setup
- Security cameras + smart locks