Todos · selections · budget

The tracker

Furniture, selections, budget, timeline — one place. Progress saves in this browser.

House todos

0/29

Room todos

0/64

Selections decided

0/154

Punch list

0/11

  • Paint all walls (whole house)
  • Repair kitchen cabinets
  • Purchase and install TVs
  • Install WiFi — map Ethernet locations first
  • Buy and install Google cameras
  • Install ADT/Google security system
  • Buy and install neon sign: “tengo mis suenos contigo”
  • Update master closet
  • Relocate master-closet sauna to basement
  • Jess: convert former guest bedroom to walk-in closet (closet to be built)
  • Audio system — install amps and other speakers

Closing & admin

0/4

  • Collect keys, codes, garage remotes, elevator key
  • Transfer utilities (Con Ed, water, internet)
  • Homeowner's insurance + alarm monitoring active
  • Change locks / rekey exterior doors

Systems

0/6

  • HVAC service — all 3 zones
  • 48kW generator service + test
  • Elevator inspection + service contract
  • Radiant floor + boiler check
  • Heated driveway / roof test before winter
  • Collect manuals + vendor contacts into one binder

Design

0/4

  • Whole-house paint palette
  • Lighting fixture refresh plan
  • Window treatment measurements
  • Furniture plan per floor

Move-in

0/4

  • Book movers + confirm date
  • Deep clean before move-in
  • Wi-Fi / network + AV setup
  • Security cameras + smart locks